Engineering & architecture jobs in Canada
Explore engineering & architecture jobs in Canada. Choose a role or place to find work that fits.
Counted
Hiring at a glance
View jobs- Open jobs
- 7,517
- Employers
- 2,277
Advertised starting pay
- Average starting payCAD / year
- $101,880Across 1,112 listings
- Average starting payCAD / hour
- $39.97Across 373 listings
Employer-advertised starting pay, not employee salaries. Currencies and pay periods stay separate.
Where work happens
- Remote
- 2%125 listings
- Hybrid
- 33%2,468 listings
- On-site
- 65%4,903 listings
Not specified: <1% (21 listings)
Employers hiring include WSP in Canada (423), AtkinsRéalis (178), Stantec (173).
Sources & calculation notes
These figures describe the listings on this role page at the date shown, not the whole job market. Listings can change.
Employer-listed minimums from at least 10 listings per currency and pay period. These are advertised starting amounts, not employee salaries. Jobs without a minimum and unusual amounts are excluded.
Hybrid and on-site classifications may be inferred from descriptions. Check the original ad. How we count
Engineering & architecture jobs in Canada
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Materials Engineer / Materials Testing and Inspection Specialist
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science-based expertise, our global minds unite to power local solutions.
Added
Materials Engineer / Materials Testing and Inspection Specialist
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science-based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior CAPEX Engineering Manager
Amrize
We’re seeking a Senior CAPEX Engineering Manager who’s ready to put your skills to work on projects that matter - and build a career with a company that’s building North America.
Added
Methods Engineer
Sapsol Technologies Inc
Review the engineering design to validate the manufacturing process of the part;
Added
Added
Drafter
Topmade Plastics & Neon Signs Ltd.
Added
Electrical engineering project manager
IGB Technologies Inc.
Electrical and electronic engineering technologies/technicians, other
Added
Senior Power Plant Engineer
WestJet
Added
Architectural Technician (FAC) - Permanent
Elk Island Public Schools
Added
Director of Engineering
Acara Solutions, An Aleron Company
We are partnering with a well-established engineered manufacturing organization to recruit a Director of Engineering who will lead the Engineering and Quality functions across multiple…
Added
cryogenics engineer
Nord Quantique
Added
Industrial Electrical Engineer - Mining and Metals
BBA Consultants
…proposals, analysis studies for industrial power systems, detailed engineering, equipment specifications, site surveys, site monitoring and commissioning of substation equipment while…
Added
Industrial Electrical Engineer - Mining and Metals
BBA Consultants
…proposals, analysis studies for industrial power systems, detailed engineering, equipment specifications, site surveys, site monitoring and commissioning of substation equipment while…
Added
Electrical Controls Engineer
Redpath Sugar Ltd
Added
Added
Civil draftsperson
Nova Pole International Inc.
Added
Construction estimator
Groupe Montoni (1995) Division Construction inc
Added
Industrial instrumentation technician
Bonbonrio Candy inc.
Added
Principal Mechanical Engineer
Broadcom