Engineering & architecture jobs in Canada (7,812 jobs)

Explore engineering & architecture jobs in Canada. Choose a role or place to find work that fits.

Hiring at a glance

View jobs
Open jobs
7,812
Employers
2,327

Advertised starting pay

Average starting payCAD / year
$102,086Across 1,150 listings
Average starting payCAD / hour
$40.50Across 386 listings

Employer-advertised starting pay, not employee salaries. Currencies and pay periods stay separate.

Where work happens

Remote
2%126 listings
Hybrid
33%2,560 listings
On-site
65%5,103 listings

Not specified: <1% (23 listings)

Employers hiring include WSP in Canada (437), AtkinsRéalis (182), Stantec (175).

Sources & calculation notes

These figures describe the listings on this role page at the date shown, not the whole job market. Listings can change.

Employer-listed minimums from at least 10 listings per currency and pay period. These are advertised starting amounts, not employee salaries. Jobs without a minimum and unusual amounts are excluded.

Hybrid and on-site classifications may be inferred from descriptions. Check the original ad. How we count

Engineering & architecture jobs in Canada

Email me new jobsSave this search
  • Senior Environmental Planner -Water infrastructure

    WSP in Canada

    London, ON

    • Full-time

    With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.

  • Senior CAPEX Engineering Manager

    Amrize

    Mississauga, ON

    We’re seeking a Senior CAPEX Engineering Manager who’s ready to put your skills to work on projects that matter - and build a career with a company that’s building North America.

  • Methods Engineer

    Sapsol Technologies Inc

    Montreal, QC

    Review the engineering design to validate the manufacturing process of the part;

  • Cost Estimator, Data center construction

    Bell

    Regina, SK

    Coordinate with Engineering, Land Development, Procurement, Construction, Operations, Finance, and Project Delivery to validate inputs and scope boundaries.

  • Drafter

    Topmade Plastics & Neon Signs Ltd.

    Calgary, AB

    • $37,440 to $52,000 CAD / year
    • Full-time
    • On-site
  • Electrical engineering project manager

    IGB Technologies Inc.

    St. Albert, AB

    • $80,000 to $120,000 CAD / year
    • Full-time
    • On-site

    Electrical and electronic engineering technologies/technicians, other

  • Senior Power Plant Engineer

    WestJet

    Calgary, AB

    • Full-time

    Reporting to the Senior Manager, Powerplant Engineering, the Senior Powerplant Engineer is responsible for the engineering management as related to the WestJet Aircraft Engine Program which…

  • Architectural Technician (FAC) - Permanent

    Elk Island Public Schools

    Sherwood Park, AB

    • Full-time
  • Director of Engineering

    Acara Solutions, An Aleron Company

    Cambridge, ON

    • Full-time

    We are partnering with a well-established engineered manufacturing organization to recruit a Director of Engineering who will lead the Engineering and Quality functions across multiple…

  • cryogenics engineer

    Nord Quantique

    Sherbrooke, QC

    • Full-time
  • Industrial Electrical Engineer - Mining and Metals

    BBA Consultants

    Mont-Saint-Hilaire, QC · Mont-St-Hilaire, QC

    • Full-time

    …proposals, analysis studies for industrial power systems, detailed engineering, equipment specifications, site surveys, site monitoring and commissioning of substation equipment while…

  • Industrial Electrical Engineer - Mining and Metals

    BBA Consultants

    Montreal, QC

    • Full-time

    …proposals, analysis studies for industrial power systems, detailed engineering, equipment specifications, site surveys, site monitoring and commissioning of substation equipment while…

  • Electrical Controls Engineer

    Redpath Sugar Ltd

    Toronto, ON

    • Full-time

    Demonstrated ability to communicate effectively both verbally and written to work effectively with peers, plant operating staff, and other engineering resources.

  • Manager, Amusement Electronics Technician or Games or AV

    Cineplex

    AB · W. Edm. The Rec Room

    • Full-time
  • Civil draftsperson

    Nova Pole International Inc.

    Surrey, BC

    • From $37 CAD / hour
    • Full-time
    • On-site
  • Construction estimator

    Groupe Montoni (1995) Division Construction inc

    Laval, QC

    • From $76,000 CAD / year
    • Full-time
    • Hybrid
  • Industrial instrumentation technician

    Bonbonrio Candy inc.

    Pointe-aux-Trembles, QC

    • From $18 CAD / hour
    • Full-time
    • On-site
  • Principal Mechanical Engineer

    Broadcom

    Ottawa, ON

    • $114,400 to $183,000 CAD / year
    • Full-time

    …development programs may require extensive interaction with partner engineering…

  • Development Engineering Manager

    BWXT

    Ottawa, ON

    To provide technical oversight and manage a team in the BWXT Medical, Engineering & Development department. Leads team to improve current manufacturing processes and solutions as well as…

  • Junior Survey Technologist (Office)

    Challenger Geomatics

    AB · Edmonton, AB

    • Full-time

    …responsible for processing field data & interpreting various engineering plan; as well as quality control and review of data pertaining to the various published products of the Geomatics…

  • Drafter

    Leedwood LTD.

    Brantford, ON

    • $45,000 to $65,000 CAD / year
    • Full-time
    • On-site
  • Senior Geotechnical Engineer / Lead Inspector

    Mott MacDonald

    Toronto, ON

    The candidate must have the following experience:

  • Architect

    Lapointe, Magne & associés, architectes, S.E.N.C.R.L.

    Montréal, QC

    • $30 to $38 CAD / hour
    • Full-time
    • On-site

    Manage the coordination and overall integration of technical activities in architecture or engineering projects

  • Computer numerical control (CNC) programmer

    Select Tool Inc.

    Oldcastle, ON

    • $25 to $33 CAD / hour
    • Full-time
    • On-site
  • Structural Engineer

    Rio Tinto

    Labrador City, NL

    • Full-time

    This is a residential role; fly-in/fly-out is not available

Get in touch
MovoJobs

Contact us