Engineering & architecture jobs in Canada
Explore engineering & architecture jobs in Canada. Choose a role or place to find work that fits.
Counted
Hiring at a glance
View jobs- Open jobs
- 6,640
- Employers
- 2,105
Advertised starting pay
- Average starting payCAD / year
- $101,183Across 934 listings
- Average starting payCAD / hour
- $38.41Across 327 listings
- Average starting payUSD / year
- $122,620Across 58 listings
Employer-advertised starting pay, not employee salaries. Currencies and pay periods stay separate.
Where work happens
- Remote
- 2%114 listings
- Hybrid
- 33%2,212 listings
- On-site
- 65%4,293 listings
Not specified: <1% (21 listings)
Employers hiring include WSP in Canada (389), AtkinsRéalis (161), Stantec (158).
Sources & calculation notes
These figures describe the listings on this role page at the date shown, not the whole job market. Listings can change.
Employer-listed minimums from at least 10 listings per currency and pay period. These are advertised starting amounts, not employee salaries. Jobs without a minimum and unusual amounts are excluded.
Hybrid and on-site classifications may be inferred from descriptions. Check the original ad. How we count
Engineering & architecture jobs in Canada
Added
DCS Control Systems Engineer
OxyChem
Added
Drafter (Architectural Millwork, Store Fixtures)
AIA Minnesota
Added
Added
Electrical Engineer
AML Oceanographic Ltd.
Added
Electrical Engineer
AML Oceanographic Ltd.
Added
Senior Power Plant Engineer
WestJet Group
Added
Intermediate Drafting Technologist
DES Engineering Limited
Ability to read and interpret engineering drawings and specifications would be considered an asset.
Added
Junior Drafting Technologist
DES Engineering Limited
Electrical Design & Drafting Technology or Engineering Design Technology Diploma or CAD Certificate from a recognized technical instit
Added
Architectural technologist
Zedd Architecture Inc
Added
Senior estimator - construction
Flynn Canada Ltd.
Added
Mine Survey Technician
Wesdome Gold Mines Ltd
Added
Land survey technician
Tatra Survey Inc.
Added
Environmental Planner
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Junior Construction Estimator
ONIT Construction Inc.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.
Added
Senior Environmental Planner -Water infrastructure
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science‑based expertise, our global minds unite to power local solutions.