Find work in Canada.
347,244 jobs across our Canadian network. How we count
Added
Manufacturing Engineer
Shred-tech
Minimum 3 - 7 years of progressive experience in manufacturing environment in a custom engineered, industrial equipment, modular assemblies.
Added
System Test Specialist
Calian in Space & Technology
Knowledge and experience with system testing, test engineering principles and validation of large-scale projects for software and hardware.
Added
Engineering - Co-op Student - Advance Molding Solution
J Sterling Industries
Assist with PPAP, FMEA, APQP, validation, work instructions, reports, and other technical documentation as applicable.
Added
Concepteur électrique / Electrical Designer
Wabtec
…livrables, le suivi des échéanciers et le soutien aux essais de validation et d’intégration. Il collaborera directement avec les clients, les groupes de produits et les équipes…
Added
Senior Mechanical Engineer (Semiconductor Packaging)
Inpho
Test Automation & Scripting: Develop custom automation scripts and control software (e.g., Python, LabVIEW, or VBA/SOLIDWORKS macros) to automate benchtop test fixtures and electro-optical…
Added
Designer, Development (Service)
Husky Technologies
Develop permanent corrective actions: from concept design, detailed design, analysis, verification, test, and validation
Added
Industrial Software Validation
Husky Technologies
The Software Validation Specialist plays a key role in our Innovation and Sustainability Team, responsible for developing and executing comprehensive testing strategies to ensure industrial…
Added
Test Automation Developer - Intermediate
PEER Group
Background in semiconductor manufacturing, factory automation, or another complex industrial software environment.
Added
Added
Human Factors/Ergonomics Professional
1ST-RECRUIT LLC, An E-Verified Company
In this group, we ensure that the design of the aircraft hardware, software, human tasks, and work environment are compatible with the perceptual, cognitive, and physical attributes of the…
Added
System Test Specialist
Calian Group
Knowledge and experience with system testing, test engineering principles and validation of large-scale projects for software and hardware.
Added
Senior Autonomy Validation Specialist / Spécialiste senior de la validation de l’autonomie
Caterpillar Inc.
As the Senior Autonomy Validation Specialist, you will develop, test, and troubleshoot software systems used for autonomy drill machines. This generally includes onboard system validation…
Added
Student-Factory Planning, AI & Simulation
PowerCo SE
-Build high-level models using simulation software such as Siemens Plant Simulation and investigate AI-assisted model generation and validation approaches
Added
Quality, Health & Safety Manager (On-Site)
Myant Shared Service Corp.
…spanning textile computing, advanced materials, electronics, software, AI, biometrics, chemical processing and manufacturing…
Added
Agentic AI Architect, Kitchener, ON ( Hybrid)
Siemens
We are seeking an Agentic AI Architect, to join Siemens Digital Industries Operations Software, to define the technical design of our Agentic AI platform and ensure the agent systems we…
Added
Manager, Supply Chain Contract Excellence
Celestica International LP
Analytical Ability: Strong skills in quantitative analysis, data validation, and basic cost-benefit modeling.
Added
Engineering - Co-op Student - Advance Molding Solution
Sterling Industries
Assist with PPAP, FMEA, APQP, validation, work instructions, reports, and other technical documentation as applicable.
Added
Designer, Development (Service)
Husky Technologies
Develop permanent corrective actions: from concept design, detailed design, analysis, verification, test, and validation
Added
System Test Engineer (COTS)
Quarry Consulting
Knowledge and experience with system testing, test engineering principles and validation of large-scale projects for software and hardware.
Added
Industrial Software Validation
Husky Technologies
The Software Validation Specialist plays a key role in our Innovation and Sustainability Team, responsible for developing and executing comprehensive testing strategies to ensure industrial…
Added
Applications Administrator
Choice Properties
…supporting requirements gathering, solution design, testing, data validation, implementation, and continuous improvement…
Added
Applications Administrator
Choice Properties
…supporting requirements gathering, solution design, testing, data validation, implementation, and continuous improvement…
Added
Field Operations Specialist
BinSentry
Experience with IoT devices, hardware-enabled software, fleet monitoring, industrial technology, or technical operations.
Added
Product Verification and Validation Engineer
VIAVI Solutions
…for 3D sensing, anti-counterfeiting, consumer electronics, industrial, automotive, government and aerospace…
Added
Senior Automation Engineer
Socomec Group
Develop test procedures and execute factory and field validation activities.