Find work in Canada.

340,590 jobs across our Canadian network. How we count

Jobs in Canada

25+ jobs

Email me new jobsSave this search
  • FITTER / WELDERS: VESSEL AND PIPE FABRICATION

    Laframboise Mechanical Electrical Ltd

    Cornwall, ON

    • Full-time

    Be Part of Something Bigger: Contribute to the success of our clients in various sectors, including petrochemical, mining, power, and more.

  • Mechanical Technician – Machinist

    Pratt & Whitney

    Halifax, NS

    • Full-time

    Prepare and interpret conventional and computer-assisted design (CAD) engineering designs, drawings, and specifications for machines and components, power transmission systems, process…

  • Maintenance Specialist

    Chrysos Corporation

    Val-d'Or, QC

    • Full-time

    Hands-on experience in one or more of the following areas: electrical wiring and safety, power distribution, mechanical maintenance, and repairs; basic electronics; metalworking;…

  • Mechanical Production Supervisor

    Eclipse Automation

    Cambridge, ON

    • Full-time

    …department. Work directly with the Project Procurement Lead, Electrical Shop, and Engineering teams to ensure production timeline and goals are met. Work with the Tool Room personnel to…

  • Intermediate/Senior Industrial Control Systems Engineer/Technologist - VIC-1070

    PBX Engineering

    Victoria, BC

    • $95,000 to $130,000 CAD / year
    • Full-time

    We are an electrical, systems, and software engineering firm, with offices in BC and Alberta, and expansion occurring in Ontario and Atlantic Canada. For more than 28 years we have…

  • Maintenance Specialist

    Chrysos

    Val-d'Or, QC

    • Full-time

    Hands-on experience in one or more of the following areas: electrical wiring and safety, power distribution, mechanical maintenance, and repairs; basic electronics; metalworking;…

  • Associate Technical Consultant

    Worley

    Calgary, AB

    • Full-time

    …across the life of their assets. We specialize in consulting, engineering, procurement and construction across the project lifecycle, with services extending through to operations and…

  • Engineer, Distribution Planning

    SaskPower

    SK · Saskatchewan, Canada

    • Contract

    Bachelor’s Degree in Electrical Engineering or equivalent

  • Principal Electrical Engineer

    Worley

    Markham, ON · Oakville, ON

    • Full-time

    The Lead Electrical Engineer is responsible for providing technical leadership and delivering electrical engineering solutions for power distribution, energy storage, and related energy…

  • Senior Technical Consultant

    Worley

    Calgary, AB · Edmonton, AB

    • Full-time

    Bachelor's degree in Electrical, Instrumentation, Computer, Process Control, or related Engineering discipline.

  • Senior / Lead Estimator - Mining & Metals

    Fluor

    Vancouver, BC

    • Full-time

    Integrate electrical discipline inputs into Engineering, Procurement, Fabrication, and Construction (EPFC) estimates, including indirects, escalation, and contingency.

  • Analyste, propositions et soumissions / Proposal-Quotations Analyst

    Eaton Corporation

    Laval, QC

    • Full-time

    Eaton’s PCS division, specializing in electrical services and power distribution systems, is looking for a Proposals & Quotations Analyst to join its team in Laval, QC.

  • Licensed Maintenance Mechanic

    UPS

    Richmond, BC

    • Full-time

    Department: Buildings and Systems Engineering

  • Licensed Maintenance Mechanic

    UPS

    Richmond, BC

    • Full-time

    Department: Buildings and Systems Engineering

  • Electrician - Maintenance Technician

    Magna International

    St. Thomas, ON

    • $47.66 CAD / hour
    • Full-time

    Cosma provides a comprehensive range of body, chassis and engineering solutions to global customers. Through our robust product engineering, outstanding tooling capabilities and diverse…

  • Engineer / EIT - Apply For Future Opportunities

    Glencore Canada

    Elkford, BC

    • Full-time

    We believe in the power of diversity and strive each day to create a workplace where each individual is valued and respected for their contributions.

  • Licensed Maintenance Mechanic

    UPS

    Richmond, BC

    • Full-time

    Department: Buildings and Systems Engineering

  • Electrical Engineer - Power Studies, Associate Intern

    Shermco Industries, Inc.

    Regina, SK

    • $22 to $35 CAD / hour
    • Internship

    As an Electrical Engineer - Power Studies, Intern, you will perform comprehensive electrical engineering studies, encompassing a range of tasks from power factor analysis to harmonic…

  • Senior Manager-Design Engineering

    Microchip Technology Inc.

    Burnaby, BC · Toronto, ON · Saskatoon, SK · Canada - Burnaby

    • Full-time

    Bachelor’s or Master’s Degree in Electrical Engineering or Computer Engineering

  • Maintenance

    Open Text Corporation

    Waterloo, ON

    Complete a wide range of general maintenance tasks, including carpentry, painting, drywall, flooring, doors, locks, ceiling systems, and minor plumbing and electrical repairs.

  • Quality Assurance Intern (Winter 2027, 12months)

    Hitachi Rail

    Toronto, ON

    • $23 to $30 CAD / hour
    • Full-time

    The successful candidate must be pursuing an undergraduate degree in Engineering or a related field at an accredited university, such as Artificial Intelligence Engineering, Mechanical…

  • Sr Program Specialist

    Honeywell Aerospace

    Mississauga, ON

    • Full-time

    …Program Managers, and Development Program Managers across the Power and Thermal Management System (PTMS), Wheels and Brakes (W&B), and Inertial Navigation System / Tactical Navigation…

  • Field Service Mechanic

    Herc Rentals

    Toronto, ON · Etobicoke, ON

    • Full-time

    Diagnose engines, DC electrical, propane, hydraulic, and fuel systems onsite using diagnostic/hand tools and measuring instruments.