Find work in Canada.

339,913 jobs across our Canadian network. How we count

Jobs in Canada

25+ jobs

Email me new jobsSave this search
  • Structural Engineer

    PTW Energy Services

    Calgary, AB

    • Full-time

    Reporting to the Manager, Engineering Services, you'll join a collaborative team responsible for the engineering, design, and detailing of modular buildings, pre-engineered steel…

  • Industrial Automation Specialist

    VANGUARD POWER LTD

    Chilliwack, BC

    • Full-time

    A plant maintenance manager calls at 06:40: the line is down, the PLC shows a fault, the operator has already tried cycling power. You are the person who walks in with the drawings and a…

  • Construction Manager/Site Superintendent

    Ameresco

    AB · Canada - Alberta - Edmonton

    • Full-time

    …reliability, optimize performance, strengthen resilience, and support long-term sustainability. Join us in building the infrastructure that powers the future. Explore opportunities to make…

  • Operations Manager

    QuadReal Property Group

    Mississauga, ON

    • Full-time

    As the Operations Manager of the Industrial East Portfolio, you will oversee daily building operations and technical service delivery across a large network of industrial properties and…

  • Sr. Engineer - P&C Asset Management

    BC Hydro

    Burnaby, BC

    • Full-time

    Provide P&C subject-matter-expertise support and liaise with other groups throughout BC Hydro, including other planning teams, Engineering, Field Operations, Grid Operations, Stations and…

  • Fleet/Equipment Lead Hand (CB)

    Clark Builders

    Edmonton, AB

    • Full-time

    Support Field Operations Manager with conducting employee performance reviews

  • Electrical Engineer / System Integrator

    Canal

    ON · Ontario, Canada

    • Full-time

    …sheets, measurements and functional descriptions) to produce engineering designs, drawings, recommendations and instructions for project stakeholders. As a part of a discipline team,…

  • Engineering Supervisor

    Thermon

    Oakville, ON

    • Full-time

    Recommend disciplinary and corrective actions as required. v As directed by the RD, support in the mentoring of select personnel to promote growth and development. v Ensure that each…

  • Operations Manager

    InVision Staffing Services Inc.

    Concord, ON

    • $130,000 to $150,000 CAD / year
    • Full-time

    Work closely with Sales and Engineering to support customer requirements, special projects, and new product introductions.

  • Operations Supervisor

    Domtar Products

    Port Alberni, BC

    Troubleshoots mechanical, electrical, and instrumentation issues to minimize downtime and maintain operational continuity.

  • Technologist Operations

    Purolator

    Quebec, QC

    Troubleshoot mechanical, electrical, software, and network issues to minimize downtime and restore performance.

  • Ingenieur(e) de projets / Project Engineer

    Pratt & Whitney

    Longueuil, QC

    • Full-time
  • Crane Service Technician – Journeyman Electrician

    Reel

    Stoney Creek, NB

    • Full-time

    Reporting to the Service Manager, the Service Technician performs the maintenance and repair work required to ensure the proper functioning of lifting equipment at our customers’ sites…

  • Junior Crane Service Technician – Electrician

    Reel

    Stoney Creek, NB

    • Full-time

    Reporting to the Service Manager, the Junior Service Technician will support the inspection, maintenance, troubleshooting, and repair of overhead lifting equipment at customer sites. This…

  • Senior Patent & IP Counsel

    Lyten

    Burlington, ON

    • Full-time

    …battery, concrete, composites, and sensors. This is both a manager and a practitioner role: Lyten is looking for someone who will personally do some of the work of protecting its IP, not…

  • Department Manager and Regional Technical Leader, Transmission and Distribution Lines

    BBA Consultants

    Boisbriand, QC

    • Full-time

    …and private sectors, both in Canada and abroad. Our experts support clients through all their project phases, from prefeasibility studies to commissioning and asset management. As…

  • Systems Development Engineer Intern, Canada 2027

    Amazon

    Vancouver, BC

    - Are enrolled in or have completed a Bachelor's degree or above in Computer Science, Computer Engineering, Systems Engineering, Electrical Engineering, or other related discipline

  • Building Maintenance Manager (Mississauga)

    Kipling Group

    Toronto, ON

    • Full-time

    Position Summary: The Building Maintenance Manager is important to the successful operation of a residential property and is responsible for the physical maintenance of the property(s) and…

  • Junior Electrician- Electrical Apprentice

    Reel

    Stoney Creek, NB

    • Full-time

    Reporting to the Operations Manager and working alongside experienced electricians, the Junior Electrician performs/ Electrical Apprentice support the electrical installation and assembly…

  • GIS Operation Leader

    GE Vernova

    La Prairie, QC

    • Full-time

    The ACS Field Service Manager is responsible for leading and coordinating field service operations to ensure safe, efficient, and high-quality customer support. This role oversees field…

  • Maintenance Technician (4th Class)

    PETERSON GROUP PROPERTI

    Vancouver, BC

    • $32 to $36 CAD / hour
    • Full-time

    …supporting the safe and efficient operation of boilers, HVAC, electrical, plumbing, and related building systems. Reporting to the Maintenance Manager, the role responds to tenant work…

  • Plant Maintenance Technician/Millwright, Overnight Shift

    Waste Management, Inc. (WM)

    Edmonton, AB

    • Full-time

    …maintaining everything from balers and conveyor belts to gearboxes, electrical motors, pulleys, shafts, and bearings. As a Plant Maintenance Technician, you'll jump into action when systems…

  • Field Service Technician - Peterbilt

    Brandt Group of Companies

    Saskatoon, SK

    • Full-time

    Diagnose and repair all engine, electrical, aftertreatment, and drivetrain components to restore optimal performance.

  • Instrumentation and Control Designer

    WSP in Canada

    Toronto, ON · Etobicoke, ON

    • Full-time

    Reporting to the Senior Manager of Electrical Engineering, you will join a dynamic and growing Resources team within the Mining and Metals Subsector where you will be responsible to plan,…

  • Facilities Specialist

    Christie Ossington Neighbourhood Centre

    Toronto, ON

    • Full-time

    Reporting to the Facilities Manager, the Facilities Specialist provides technical, project, and operational support for the maintenance, improvement, and long-term sustainability of…