Find work in Canada.
345,042 jobs across our Canadian network. How we count
Added
Test Engineering Technologist - Process Packaging
Husky Technologies
Excellent understanding of fluid power and electrical schematic
Added
Test Engineering Technologist
Husky Technologies
Excellent understanding of fluid power and electrical schematic
Added
Designer, Development (Mechanical)
Husky Technologies
Cross discipline interaction and communication including cross discipline inputs – Analysis, Electrical, Software, Fluid Power, Metallurgy, Manufacturing, Validation/Test
Added
Industrial Software Validation
Husky Technologies
…end-user needs. Leveraging broad expertise across mechanical, electrical, software, and fluid power systems, this role ensures seamless system integration and defect-free performance that…
Added
Product Development Engineer
Husky Technologies
Cross discipline interaction and communication including cross discipline inputs – Business Development, Analysis, Electrical, Software, Fluid Power, Metallurgy, Manufacturing,…
Added
Assembly Technician (Contract)
Husky Technologies
Use hand tools, power tools, and precision measuring instruments to assemble components, verify tolerances, and ensure conformance to engineering specifications.
Added
Designer, Development (Electrical)
Husky Technologies
Do you enjoy solving complex electrical design challenges as part of a multi-discipline engineering team? Do you want to see your designs progress from ideas to fully functioning automated…
Added
Lead RTL Engineer
Schweitzer Engineering Laboratories (SEL)
B.S. degree in Electrical Engineering, related discipline, or equivalent combination of education and experience
Added
Software Developer
ATS Industrial Automation
Bachelor's Degree in Computer Science, Software, Electrical or Computer Engineering
Added
Testing and Commissioning Lead - Traction Power
Colas Canada Inc.
Degree or diploma in Electrical Engineering, Power Engineering, or related discipline.
Added
Journeyed Trade, Instrumentation and Control Technician
SaskPower
We generate more than just power for the people of Saskatchewan. We also offer some of the best jobs in the province. Our challenging careers will help you grow, while being surrounded by a…
Added
Diesel Engine HDM
CN
…service diesel-electric locomotives and related mechanical, electrical, pneumatic, hydraulic, and air brake systems. The role supports safe and reliable railway operations by completing…
Added
Electrician Lead Hand - Facility Maintenance
CN
Experience troubleshooting power distribution, emergency power, and high-voltage electrical systems using electrical drawings
Added
Car Mechanic (Freight Car Repairer)
CN
Use hand tools, power tools, welding equipment, cutting torches and measuring instruments
Added
Industrial Engineering Intern
Legrand
Legrand has an exciting opportunity for an Industrial Engineering Intern to join the Electrical Infrastructure division in Mississauga, ON.
Added
Lead, Manufacturing Engineer
Rocket Lab
Based out of Rocket Lab's site Sinclair Interplanetary in Toronto, Ontario, Canada, this role reports to the engineering manager and is responsible for leading the manufacturing team to…
Added
SCADA Transmission Engineer
Raise
4 years of progressive engineering experience in a relevant field, specifically demonstrating hands-on involvement with electrical utility substations, power systems, or industrial…
Added
Professor - Industrial Robotics
Seneca Polytechnic
Minimum completed PhD in Robotics, Mechatronics, Electrical/Mechanical Engineering, or a related field.
Added
Specialist, Automation
Glencore
Electrical, Instrumentation Technologist or Mechanics with an Automation focus or related field, or bachelor’s degree in Computer Engineering, Electrical Engineering, or related subject area
Added
Assembly Technician
Rosenberg Fans Canada Ltd.
…market, the company provides sales, stock, local assembly, engineering and after-sales solutions to clients all over the Canadian…
Added
Electrical Utilities Electrician
University of Alberta
The Electrical Utilities group is responsible for the safe and reliable operation of the 15kV network in the Greater Campus Area (GCA), South Campus, Devon, Kinsella, Camrose and other…
Added
Talent Acquisition Specialist - Data Centres
EllisDon
4 to 7 years of full-cycle recruitment experience in construction, engineering or infrastructure, including complex MEP-heavy projects such as hospitals, labs, pharma, industrial, power or…
Added
JR./INTERMEDIATE PROJECT MANAGER AND A SENIOR PROJECT MANAGER
Laframboise Mechanical Electrical Ltd
Engineering or technical degree (and eligible for professional status) with multidiscipline engineering and construction experience including civil, mechanical, structural, and electrical.
Added
JR./INTERMEDIATE PROJECT MANAGER AND A SENIOR PROJECT MANAGER
Laframboise Groupe
Engineering or technical degree (and eligible for professional status) with multidiscipline engineering and construction experience including civil, mechanical, structural, and electrical.
Added
Solar PV Engineer
WSP in Canada
With an unmatched breadth and depth of engineering, advisory and science-based expertise, our global minds unite to power local solutions. We are pathfinders and impact makers.