Find work in Canada.
339,913 jobs across our Canadian network. How we count
Added
Added
Added
Added
Equipment operator - municipal public work
City of Brandon
Added
Truck driver
Gregory Greenhouses Inc.
Oversee condition of vehicle and inspect tires, lights, brakes, cold storage and other equipment
Added
Added
Stacker operator - heavy equipment
S & R Trucking Inc.
Clean and lubricate equipment and refill equipment tanks
Added
Truck dispatcher
Ingersoll Transport
Schedule assignments and co-ordinate activities of vehicle operators, crews and equipment
Added
5 Ton Delivery Driver
Armour Transportation Systems
Career Advancement – We offer opportunities to grow within the company and become an owner operator down the line.
Added
Multiple Roles Avaliable
CEC (Cutting Edge Consulting Inc.)
With offices in Vancouver, Kamloops, and Prince George, we bring together the people, equipment, and expertise needed to support projects of varying size and complexity across a wide range…
Added
Store Manager
Freshslice Pizza
Overseeing the general operation of the Freshslice Location assigned to you and act like owner operator. Following Freshslice manuals, guidelines and forms. Maintaining the Freshslice…
Added
Store Manager
Freshslice Pizza
Overseeing the general operation of the Freshslice Location assigned to you and act like owner operator. Following Freshslice manuals, guidelines and forms. Maintaining the Freshslice…
Added
BAS Graphics Designer – Building Automation / EBO (GDBA003)
Potenco
Create equipment pages, system graphics, floor plans, navigation pages, and operator displays using approved project templates and standards.
Added
CNC machining tool operator
Granite Warehouse Inc.
Perform routine maintenance on equipment and machinery
Added
Packaging Setup Technician
Apotex
Operate all packaging equipment within specifications and provide accurate detail to mechanical staff regarding equipment problems
Added
General Repair Technician - Static
BGIS
…maintenance, routine and on-demand services on facility mechanical equipment and other systems. The General Repair Technician is also responsible for performing work in accordance with…
Added
Plastic extruder operator
Novatech Canada
Prepare and change moulds and adjust equipment for production line change
Added
Loader Operator- Night Shift
Argus
Operate tools and equipment to handle and prepare the OCTG within the manufacturing plant, including horizontal/ vertical saws, MRE swage units, coil induction stress relievers, phosphate…
Added
Operator – Process
Canadian Energy Insight Inc.
Spartan Delta Corp. is seeking an individual to fulfill the responsibilities of an Operator – Process – Alder Flats Plant in the Field Operations team. This role is responsible for…
Added
Municipal Tractor Operator - Levack
City of Greater Sudbury
Main Function: Operate municipal tractor with attachments or other similar type equipment.
Added
Municipal Tractor Operator - St. Clair
City of Greater Sudbury
Main Function: Operate municipal tractor with attachments or other similar type equipment.
Added
Municipal Tractor Operator (St. Clair)
City of Greater Sudbury
Main Function: Operate municipal tractor with attachments or other similar type equipment.
Added
Class 1 Driver
American Iron & Metal (AIM)
American Iron and Metal is searching for experienced Self Loader / Operator with a Class 1 License for more than 2 years based out of Moncton. Experience in any machinery is an asset.
Added
Industrial Automation Specialist
VANGUARD POWER LTD
A plant maintenance manager calls at 06:40: the line is down, the PLC shows a fault, the operator has already tried cycling power. You are the person who walks in with the drawings and a…
Added
Aquatic Service Technician - Journeyman Electrician
Automated Aquatics Canada Ltd.
…background while branching into pump installations, minor plumbing, equipment maintenance, general service work, troubleshooting, and aquatic system installations. The ideal candidate is…