Find work in Canada.

340,737 jobs across our Canadian network. How we count

Jobs in Canada

25+ jobs

Email me new jobsSave this search
  • DRC Supervisor

    The Salvation Army in Canada

    Victoria, BC

    • Full-time
  • Surface Equipment Operators

    Discovery Mining Ltd

    Chapleau, ON

    • Full-time

    …managing stockpiles, maintaining haul roads, and assisting with general mine operations while adhering to all safety, environmental, and operational…

  • Transportation logistics coordinator

    OTI Logistics

    Brampton, ON

    • $29 to $37 CAD / hour
    • Full-time
    • On-site
  • Screen Printing Press Operator

    Coastal Reign Printing Ltd

    Toronto, ON

    • Full-time

    Perform general screen printing responsibilities, such as:

  • general labourer - manufacturing

    K-Bro Linen Systems

    Mississauga, ON

    • Full-time
  • Maintenance

    Open Text Corporation

    Waterloo, ON

    Complete a wide range of general maintenance tasks, including carpentry, painting, drywall, flooring, doors, locks, ceiling systems, and minor plumbing and electrical repairs.

  • Dispatcher, trucks

    Ranger Motor freight

    Kitchener, ON

    • From $36.5 CAD / hour
    • Full-time
    • On-site
  • Truck dispatcher

    Ingersoll Transport

    Ingersoll, ON

    • $21 to $26 CAD / hour
    • Full-time
    • Contract
    • On-site
  • Multiple Roles Avaliable

    CEC (Cutting Edge Consulting Inc.)

    Kamloops, BC

    • Full-time

    From hoisting and heavy hauling to general contracting, fabrication, foundations, and specialized field services, we bring practical experience, capable crews, and the right equipment to…

  • Store Manager

    Freshslice Pizza

    Vancouver, BC · Greater Vancouver, BC

    • $45,000 to $60,000 CAD / year
    • Full-time

    Overseeing the general operation of the Freshslice Location assigned to you and act like owner operator. Following Freshslice manuals, guidelines and forms. Maintaining the Freshslice…

  • Store Manager

    Freshslice Pizza

    Hamilton, ON

    • $45,000 to $60,000 CAD / year
    • Full-time

    Overseeing the general operation of the Freshslice Location assigned to you and act like owner operator. Following Freshslice manuals, guidelines and forms. Maintaining the Freshslice…

  • General Repair Technician - Static

    BGIS

    Ottawa, ON

    • Full-time

    The General Repair Technician is responsible for operating the facility including, but not limited to mechanical other supporting systems; performing structured inspections, preventative…

  • Wastewater Laboratory Technician

    The District of Sechelt

    Sechelt, BC

    Under the general supervision of the Chief Wastewater Operator, and reporting to the Manager of Wastewater, this hands-on position involves operating the wastewater treatment plant and…

  • Loader Operator- Night Shift

    Argus

    Nisku, AB

    • Full-time

    Provide general shop and yard labour as required.

  • Operator – Process

    Canadian Energy Insight Inc.

    Alder Flats, AB

    • Internship

    Title: Operator – Process – Alder Flats Plant

  • Aquatic Service Technician - Journeyman Electrician

    Automated Aquatics Canada Ltd.

    AB · Edmonton, AB

    • Full-time

    …pump installations, minor plumbing, equipment maintenance, general service work, troubleshooting, and aquatic system installations. The ideal candidate is teachable, practical, and curious,…

  • Site Support Worker

    Cota

    Toronto, ON

    • Contract

    …community; facilitate tenant house meetings; participate in tenant/operator dispute meetings; work with stakeholders during a tenant…

  • Resident Services Manager

    FirstService Residential Canada

    AB · Edmonton, AB

    • Internship

    5th Class Operator’s License Required and person liable vehicle required.

  • General Repair Technician - Static

    BGIS

    Ottawa, ON

    • Full-time

    The General Repair Technician is responsible for operating the facility including, but not limited to mechanical other supporting systems; performing structured inspections, preventative…

  • Burning table operator - metal fabrication

    TMS Système

    Saint-Henri-de-Lévis, QC

    • From $26.5 CAD / hour
    • Full-time
    • On-site
  • construction schedule coordinator

    Richmond Elevator Maintenance LTD.

    Richmond, BC

    • Full-time
  • Maintenance Technician

    OPENLANE

    Airdrie, AB

    • Full-time

    General custodial duties, including cleaning of floors & sale lanes.

  • Class 3 Operator

    Clean Harbors

    Fort McMurray, AB

    • Full-time

    Performs pre and post trip inspections including maintenance of equipment and general repairs;

  • Maintenance Services Worker

    HealthCareersInSask.ca

    Wakaw, SK

    Job Description: Performs general maintenance and repairs for facility/plant systems, equipment, grounds and buildings.

  • Assistant University Veterinarian, VP Research

    University of Calgary

    Calgary, AB

    • Full-time

    …The role requires a DVM (or equivalent), eligibility for a general Alberta veterinary licence. At least two years of animal-based research experience is preferred. Strong communication,…