Back to results

Construction Scheduler- Water, Wastewater and Pumping Stations

  • Toronto, ON, Canada

Full-time

Applications open in a new tab.

Job details

Job type
Full-time
Experience
5+ years of progressive construction scheduling / project controls experience, preferably with a general contractor or heavy civil contractor.
Posting language
English
Posted

Original job description

Title

Construction Scheduler (Water, Wastewater and Pumping Stations)

Company

SKYGRiD is an industry-leading construction and building services company. We serve clients in the industrial, commercial, institutional, and residential markets, by utilizing our collaborative team approach to fulfill their building’s purpose.

What You Will Be Doing

The Construction Scheduler is responsible for developing, maintaining, analyzing, and communicating project schedules for complex heavy civil infrastructure projects, with a focus on water treatment, wastewater treatment, pumping stations, and related civil, mechanical, electrical, and I&C scopes. Working closely with Project Executives, Project Managers, Superintendents, subcontractors, consultants, and owners, the Scheduler builds and maintains Critical Path Method (CPM) schedules from pre-construction through commissioning and turnover, supports change management, and provides schedule visibility that drives safe, predictable, and on-time project delivery.

This posting is for an existing vacancy within our organization.

Project Management

  • Developing fully integrated CPM baseline schedules for water/wastewater treatment plants, pumping stations, reservoirs, and related linear works (e.g., siteworks, underground services, yard piping), including design/permit interfaces where applicable.
  • Building schedule logic, constraints, calendars, and work breakdown structures (WBS) aligned to contract requirements, execution strategy, procurement plans, and construction sequencing.
  • Incorporating key project phases including submittals/approvals, procurement and fabrication, civil/structural, process/mechanical installations, electrical and instrumentation, SCADA/controls integration, testing, start-up, commissioning, and turnover.
  • Maintaining and updating project schedules at agreed intervals (weekly/bi-weekly/monthly), incorporating verified field progress, production rates, approved changes, and forecasted activities.
  • Preparing short-interval plans and lookaheads (e.g., 2–6 week and 90-day) to support field execution, trade coordination, and material/equipment readiness.
  • Performing critical path and near-critical path analysis, float consumption analysis, milestone trend analysis, and variance reporting; clearly communicate schedule risks and recovery options.
  • Facilitating schedule review meetings with project teams and trade partners to validate sequencing, duration assumptions, constraints, and responsibility handoffs.
  • Supporting change management by preparing time impact analyses (TIA) and schedule narratives for scope changes, RFIs, design revisions, unforeseen conditions, and owner-directed changes.
  • Assisting project teams with extension-of-time requests and schedule-related claim documentation by maintaining clear schedule records, assumptions, and contemporaneous updates.
  • Developing recovery schedules and acceleration scenarios as required (re-sequencing, overtime/shift work, additional crews, alternative means and methods), including pros/cons and schedule impacts.
  • Producing schedule deliverables and reporting (e.g., baseline and update reports, S-curves, histograms/resource or manpower curves where required, key milestone summaries, and executive dashboards).
  • Interfacing with owners, consultants, and third-party schedulers to align reporting formats, update cycles, and compliance with specification requirements.
  • Ensuring schedule integrity and quality control (logic checks, open ends, constraints, calendar alignment, progress methodology, and version control).
  • Promoting a collaborative, safety-first approach by integrating schedule planning with site logistics, access constraints, and safe work sequencing.
  • Other duties, as required.

What You Will Bring

  • 5+ years of progressive construction scheduling / project controls experience, preferably with a general contractor or heavy civil contractor.
  • Demonstrated experience scheduling water/wastewater treatment facilities, pumping stations, or similar process/mechanical infrastructure projects (civil + MEP + I&C).
  • Post-secondary education in Civil Engineering Technology, Construction Management, Engineering, or a related discipline; equivalent experience will be considered.
  • Strong understanding of construction means and methods, procurement sequencing, commissioning/turnover requirements, and interface management across multiple trades.
  • Experience working with contract schedule specifications, owner/consultant review processes, and schedule update governance.
  • Working knowledge of schedule risk, delay concepts, and the fundamentals of time impact analysis and schedule narratives.
  • Advanced proficiency with Microsoft Project, including building logic-driven CPM schedules and producing schedule reports.
  • Strong Microsoft Excel skills for progress tracking, quantity/production analysis, and schedule reporting.
  • Ability to interpret drawings, specifications, contract documents, and project execution plans to build schedule scope and logic.
  • Familiarity with project management and document control platforms (e.g. Viewpoint, SharePoint) is considered an asset.
  • Clear written and verbal communication skills; confident presenting schedule status, risks, and recovery strategies to project leadership and external stakeholders.
  • Strong planning mindset with the ability to translate scope into executable sequencing and measurable milestones.
  • Analytical and detail-oriented; able to identify logic gaps, missing scope, and schedule drivers early.
  • Proactive problem-solver who escalates risks with options and recommendations.
  • Collaborative partner to project teams; able to influence without direct authority.
  • Organized and disciplined with version control, documentation, and schedule governance.
  • Comfortable working in fast-paced environments with multiple competing deadlines.

Top Benefits And Perks

As a team member at SKYGRiD Construction you’ll enjoy:

  • Opportunity to contribute to technically complex infrastructure that supports communities (water, wastewater, and critical utility systems).
  • A collaborative team environment with strong field/ office partnership.
  • Competitive compensation and benefits package (based on experience).
  • Career development opportunities within project controls, operations and leadership pathways.
  • Great Place to Work™ certified

Pay Transparency

The estimated salary range for this role is $80,000- $120,000.

The posted salary range reflects the expected base pay for this role. Actual compensation will depend on job-related skills, experience, and qualifications. SKYGRiD is committed to pay equity and transparency, and further details will be shared during the hiring process.

Working Conditions

  • This role is project- based and may require a mix of office and jobsite work to validate progress and support short-interval planning.
  • Travel within the GTA and Ontario to active project sites is required, as needed.
  • The Scheduler is expected to work closely with field leadership to ensure schedules reflect real-world constraints, safety requirements, and execution plans.

Location:

Greater Toronto Area

Travelling will be required to job site. Having a vehicle would be beneficial.

SKYGRiD is committed to building a diverse workforce representative of the communities we serve. Only selected candidates will be contacted for an interview. Accommodation will be provided in all parts of the recruitment and assessment (if applicable) process as required under SKYGRiD’s Accessibility policies and procedures. Applicants must make their accommodation needs known upon requests for interviews.

Visit our website at www.skygrid.ca to explore other opportunities with SKYGRiD.

SKYGRiD is an Equal Opportunity Employer.

Notice to Recruiters: SKYGRiD does not accept unsolicited resumes from recruitment agencies. Any resumes submitted without a prior written agreement will be considered the property of SKYGRiD, with no obligation for fees.
More about this job

Responsibilities

Develop and maintain integrated CPM baseline schedules for complex water and wastewater infrastructure projects from pre-construction through commissioning. Perform critical path analysis, manage schedule updates, and provide time impact analyses to support change management and project delivery.

Requirements

Requires 5+ years of construction scheduling experience in heavy civil or process infrastructure and a post-secondary degree in Engineering or Construction Management. Must be proficient in Microsoft Project and Excel with a strong understanding of construction means and methods.

Skills

  • CPM Scheduling
  • Critical Path Method
  • Time Impact Analysis
  • Microsoft Project
  • Microsoft Excel
  • Water/Wastewater Infrastructure
  • Project Controls
  • WBS Development
  • Resource Histograms
  • S-Curves
  • Commissioning and Turnover
  • Change Management
  • Schedule Risk Analysis
  • Construction Sequencing
  • Interface Management
  • Technical Reporting

Benefits

  • Competitive Compensation
  • Benefits Package
  • Career Development Opportunities

Visa sponsorship

Not detected in the job text

Categories

  • Construction
  • Engineering
  • Management & Leadership

Keywords

  • CPM
  • Critical Path Method
  • Water Treatment
  • Wastewater Treatment
  • Pumping Stations
  • Microsoft Project
  • Microsoft Excel
  • Time Impact Analysis
  • WBS
  • S-Curves
  • Histograms
  • SCADA
  • I&C
  • MEP
  • Heavy Civil
  • Project Controls
  • Viewpoint
  • SharePoint
  • Commissioning
  • Turnover
  • Baseline Schedule
  • Float Consumption
  • Milestone Trend Analysis
  • Variance Reporting
  • Construction Management
  • Civil Engineering
  • GTA
  • Ontario
  • Infrastructure
  • Project Management

Report this job