|
· Check components at start of shift (valves/cans) - verify Item code with Shop Packet
· Every hour and at start of shift check the following:
1) weights of concentrate and propellant
2) pressure
3) vacuum
4) crimp depth & diameter, stem height
5) water bath temperature and water level
6) Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
· Make sure there is water in the water bath maintained at or above 130oF
· Check for dents and dirt
· When using Nitrogen, make sure it is going in the can
· Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
· At the end of a run, do a good wash-up:
1) clean up filling heads, conveyors, hopper
2) gas room
3) Fill out Filling Room Cleaning Log
· At the end of a run, remove all cans/valves from the last run
· Fill out Line Set-up Form in the following areas:
1) Inspect Cans/Labels for damage
2) Check codes against batch sheet
3) Concentrate Release Number
4) Sanitation of Surge Tank and Filling Heads Completed
5) Scale Set-up (for tare weight)
6) Line Set-up Purge
7) Water temp between 55°C - 65°C(130°F-154°F).
· No green stickers are to be left on pails.
· Perform other duties as assigned.
|